City to Begin Asphalt Seal Coating on Walker Road July 19th

city-of-np

The City of North Platte Engineering Departments’ contractor, Hall Brothers, will begin their seal coating operation and will continue this project for 2-3 weeks on asphalt streets that have been overlayed within the last ten years or so. You will be notified with a printed flier which will be posted on cars parked along the street and placed in the doors of residences along the project streets. There will be some short periods of time that your driveway will not be accessible as these operations pass your residence. We apologize for any inconvenience that this may pose and will work as quickly as possible to minimize the inconvenience.

If you have any questions, please contact the contractor on site, or the Engineering Department at 535-6724. Seal coating is scheduled to begin Wednesday, July 19, 2023, on Walker Road from Willow Street to Echo Drive.

Prior to the seal coating residents are asked to remove all vehicles and trailers by 7:00 AM. You are reminded to pull all vehicles as far onto your property to avoid the possibility of flying debris and/or overspray of oil onto your vehicle.

Vehicles left on street will be towed away from the work area. Turn off all sprinklers. Drive cautiously on sealed streets until excess material has been removed.

Once the asphalt is cured, usually within one day regular parking can resume. Note that liquid asphalt will stick to shoes and tires and is difficult to remove, please keep children and pets away from the street.